News

Alternative routes slow traffic due to construction Dialogue Center

Published on
October 6, 2020

Due to the size of the building site for the Dialogue Center at the Hoge Steeg on the campus, the cycle path from the roundabout through the nature strip in front of Atlas towards FrieslandCampina and further on is closed to slow traffic. Cyclists and pedestrians (from the bus stop) are now advised to find their way via the Hoge Steeg. Research has shown that the road is wide enough for cyclists. A special foot path is currently being constructed for pedestrians. This path is expected to be ready on Friday, October 9. The new situation will last until summer 2022.