News

New teaching building on Wageningen Campus

Published on
May 2, 2018

A new teaching building is coming to Wageningen Campus, which according to current planning will come into use in September 2021. The building will be situated opposite the Rikilt building and will replace the Triton building. The StartHub is still housed there but will temporarily move to the bottom floor of the Atlas building at the end of this year.

Along with a large lecture hall for 225 students, the new building will primarily house examination and project rooms, which is important in connection with the growing number of students.

The area will be approximately 7.500 square metres. By comparison: the Atlas and Plus Ultra buildings are respectively 10.000 m2 and 6.000 m2.

More information